After a detailed review of the RP with a goal of making minimal added changes following the fall meeting, I took a different direction. I have spoken with many fleets in the interim about shore power for refrigeration and what guidance they are looking for. The RP was not aligned with that feedback. I added sections for opportunities and fleet readiness as well as procedures for connection and disconnection (recommended). I also re-arranged the existing content into a more logical flow and made sure my references were correct and accurately called out in the document. So, please review this as a draft and prepare to bring your feedback to the Task Force meeting at the Annual Meeting. Thanks !!